Ana Sayfa Dosyalar Mesaj Panosu İletişim
Linkler
 
 linkedin
 facebook
 twitter
Takvim
 
Anasayfa

Adnan  Delikel

Deputy Plant MANAGER

 My Objective

Seeking a position in a company where I can utilize my background in  order to help my employer better serve his customers while attaining job satisfaction, growing in the company and learning new things, 

Deputy Plant Manager -

 (07.2011 – Present  ) – Sarıgözoğlu Press Bursa Plant. Bursa

Sarıgözoğlu Press & Metal Co is one the supplier that is producing coil blanking, press part, assembly part with 25 white collar and 133 blue collar within 20 thousand square meter closed production area. Process main line can be summary like as ; Two Press Robotic Tandem line 2000T -850T and Robot welding assembly shop. Main customer FIAT Doblo, Albea & FORD  Transit line.

Production  & Planning Manager -

 (06.2010 – 07.2011  ) – HOWON Automotive. Kocaeli 

  •  Howon Co. is one the largest Korean Automotive supplier that is producing coil blanking, press part, assembly part with 35 white collar and 256 blue collar within 21 thousand square meter closed production area. Process main line can be summary like as ;65 ie. Kawasaki Spot welding and CO2 welding robot, ROTEM 50T Balking line, Two press line SIMPAC & ROTEM 1000T-600T-400T-400Twith each line 6 transfer ABB Robot with automatic DIE and Tool Changer
  • Role in company was during start-up phase project management responsibility with Korean team
  • Role in company is a production & planning department management with 4 engineer and 178 blue collar
  •  Assembly line  produce one car model %80 semifinal product in 50 station with 318 ea different type sub and assy part.  
  •  ERP-SAP integrated business management system implementation both assembly and press production & planning phase execution
  • ISO/TS 16949 Quality management system application related tool ;FMEA & 8D discipline problem solving methodology, follow up weekly base PPM internal & customer (2011 aver. 34 PPM) ISO 14001  Environment management system implementation to respect sustainable future 


 Maintenance Section Manager   –

 (08.2007-02.2009) HYUNDAI  Automotive Car Manufacturing Turkey Plant

Hyundai is automotive production company where is located in Kocaeli, with is 130 white collar and 1400 blue collar workers

  • Maintenance Section Manager Main Role, 4 maintenance shop annual workload, investment & resource planning Utility, Body, Paint, Trim, 5 engineer, 68 blue collar electrical-mechanical team organization
  • Coordinate and follow-up, planned shutdown program, Condition Based Maintenance (thermal camera-vibration analysis
  • Management of CMMS Computerized Maintenance Management System ( work order, equipment history chart, job planning, spare part control, equipment BOM, Manpower allocation  to assure coordination of all aspects of preventive, corrective and planned maintenance scheduling
  • Follow up KPIs of maintenance activities ,machine efficiency ratio, cost & energy saving, suggestion, health and safety standards,
  • Prepare and manage Capital Budget  

 Key Projects & Achievements:

  • Integration of Computerized Maintenance Management System  -CMMS
  • Volume up Chemical Waste Water Treatment, Biological WWT established

 

Project Department Section Manager   –

(11.2005-08.2007) HYUNDAI  Automotive Car Manufacturing Turkey Plant  

  • Project Team  Manager Main Role, Volume Up  project team  management which is consist of 4 Production engineer, 4 Maintenance engineer, 1 QA, 1PC, 1 Purchasing engineer  
  • Lead  engineer responsible for the installation and  start-up of new  investment.  Responsible for directing engineering and the maintenance  staff in  support  of  the  new  installations,  design,  troubleshooting,  analysis. Operator-maintenance member  training, establishment of cost budget and control, establishment of schedule control. Hired  and  managed  all  contractors  involved    with  the construction, installation and start-up.  

Key Projects & Achievements:

  • %30  Plant Production  Volume Up project coordination ,commissioning, Machinery & Equipment production  and installation Project budget :35 million $
  • Press Shop establishment with building – infrastructure and process equipment 2400-1800-1000-500 Ton Mechanical Press Line-18 SPH
  • 36 UPH capacity bumper painting shop setting-up   

Paint Shop Maintenance Chief –

(09.2002-11.2005) - Hyundai  Automotive Car Manufacturing Turkey Plant

 Ensure that paint processes (Pre Treatment, ED Coating, Sealing, Primer, Topcoat)   are maintained and running effectively for vehicle production with 23 technician

  • Proactively identify & pursue opportunities to improve operations by reducing cost, reducing energy usage, improve quality, etc 

Key Projects & Achievements:

  • New Starex –Matrix- Accent  Model   ( Paint Shop Project Leader)
  • HVAC system improvement related Primer- Topcoat Paint spray booth
  • CO2 & Foam & Sprinkler, FM-200 Fire Fighting system project design, implementation
  • Wastewater treatment system management under ISO14001 environment procedure
  • ED Coating process capacity increased and UF filter system improved
  • Paint Shop 16 DURR Painting Robot and infrastructure installation, commissioning

 

Body  Shop Production & Process Engineer–

(08.1999-09.2002) -Hyundai  Automotive Car Manufacturing Turkey Plant    

  • Ensure that Body shop production (Accent Line)   are maintained and running effectively for vehicle production with 280 blue- collar
  • Application all of the product engineering changes
  • Responsibility for implementing of the productivity projects
  • Developing product and process quality utilizing lean manufacturing disciplines and tools; Kaizen, 6-Sigma, 5S.

 Key Projects & Achievements:

  • New Matrix Model production phase project follow-up   ( Assembly Shop Project Leader)
  • New Accent Model production phase project follow-up   ( Assembly Shop Project Leader)
  • Engine line all process & equipment plan, project and implementation   

 

Education :Kocaeli University – MBA  2008-2009

                Kocaeli University Electrical Engineering 1998

                Süleyman Çakır Highschool  - Eskişehir 1993

 Language  : Turkish   (Native)

                     : English  (Fluent) 

Personal

Date of Birth, place       :      1974 Eskisehir, TURKEY

Address                       :      BURSA  

 

 Skills

  • SAP Knowladge 
  • Good experience MS Office Application 
  • Electrical design, schematic diagrams with EPLAN Ver 8.0,  AutoCAD
  • Extensive experience with  Mitsubishi FX –A – Q Series,  Siemens S7-200 /S7-300, Allen-Bradley SLC 500/2, PLC -5  SCADA design and configuration with RSView32 and WonderWare
  • Good knowledge of Servo Motor Controller and AC-DC drive (VFD) controller
  • Honeywell field control instrument – Fail Safe Control
  • CCNA Network Certification-LAN application
  • FESTO Pneumatics- Hydraulics / Electro pneumatics, Maintenance
  • Eclipse & Maxon Industrial Burner & Combustion system maintenance
  • Waste water treatment facility management (GOEMA)
  • Hamworthy Steam boiler maintenance  with Honeywell field  control instruments
  • Building automation system control & utility facility(Johson Control )
  • Electrical standard regulation such as  NFPA, IEEE etc.

Abroad Technical Course & Training

  • Maintenance management advance training in-four weeks- South Korea-Namyang-RND Center 2007
  • Paint Shop Maintenance Management Global Training – Ulsan-South
  • Painting Robot programming  & maintenance supervisor training, three weeks Durr Training Center Beittigheim-Germany 2006
  • Sames Painting Machine Maintenance Training – France
  • ABB Transfer Robot Maintenance Training - England

 

Management  & Quality Training

  • ISO 9001 Quality Management System - Lead Auditor Training, TSE, 2003
  • ISO 14001 Environmental Management System - Lead Auditor Training, TSE,
  • Continuous Improvement (Kaizen)& 5S Training, Karen Education Consultancy,
  • Efficient Productive Maintenance -Lean Manufacturing Techniques ,
  • Total Productive Management (TPM)    NMT Danışmanlık ve Eğitim Merkezi İstanbul 2005
  • Problem Solving Techniques, Stress Management , Karen Education Consultancy,2006
  • Lean Manufacturing and Value Stream Method, Karen Education Consultancy,2007

 

Hava Durumu
Anlık
Yarın
15° 23° 16°
Saat
 
 
 
 
 
Yer sağlayıcı: Yurdum Yazılım